Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Libby administrator reports on spoils-pile plan, Spruce Street delays and reservoir leaks; requests emergency DNRC funds
Summary
City Administrator presented a 90% engineering draft for the spoils pile and said parking-lot work will be scaled to a $250,000 parameter unless more funding is found; he reported reservoir and Rees Court leaks with a proposed underwater-safe epoxy repair and said the mayor signed a DNRC emergency request for $30,000 with a $6,000 city match estimated.
City Administrator provided multiple infrastructure updates during the meeting, including a near-final engineering draft for the town’s spoils/gravel pile, a schedule update on Spruce Street construction, and ongoing work to stop leaks in two reservoirs.
On the spoils/gravel pile, the administrator said he and WWC Engineering have reviewed a 90% draft engineering and a preliminary hydrology study; the design team proposed a set of alternatives and developed an option (referred to in the record as “option D”) that uses a French drain, the existing ravine with small dams, and a large settling basin to slow water and…
Already have an account? Log in
Subscribe to keep reading
Unlock the rest of this article — and every article on Citizen Portal.
- Unlimited articles
- AI-powered breakdowns of topics, speakers, decisions, and budgets
- Instant alerts when your location has a new meeting
- Follow topics and more locations
- 1,000 AI Insights / month, plus AI Chat

