Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the County Business Voting topic

No spam. Unsubscribe anytime.

Votes at a glance: Codington County Commission approves plats, bridge design exceptions, jail payments and personnel actions

Codington County Commission · December 4, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

At its Nov. 25 meeting the Codington County Commission approved three plats, authorized the chair to sign three SD DOT bridge design-exception documents, approved jail-construction claims including a $473,003.58 pay application, accepted a state CVSO salary reimbursement agreement for 2026 and voted to hire to fill a sheriff deputy vacancy; an executive session on personnel/security followed.

The Codington County Commission on Nov. 25 approved a slate of routine but consequential items, including three plats, three bridge design-exception documents required by the South Dakota Department of Transportation, large construction payments tied to the new county jail and several personnel and finance actions.

The commission approved the Nov. 25 meeting agenda and the Nov. 18 minutes by voice vote at the start of the session. Planning staff presented three plats: Nancy and Berry Addition (plat 2025‑19), the Davis Addition (plat 2025‑20) and Lot 1 and Lot 2 of Gebhardt First Edition (plat 2025‑21). Commissioner Gable recused from the Gebhardt vote, saying it involved a relative; the remaining commissioners approved the plat.

Engineer Mark Yunker of Banner briefed the commission on three bridge hydraulic studies and associated design-exception documents required by the South Dakota Department of Transportation. The county authorized the chair to sign the design-exception packets for bridge 15‑154‑080 (design speed and headwater exceptions), bridge 15‑171‑044 (25‑year headwater elevation exception over the Big Sioux River) and bridge 15‑215‑230 (overtopping-frequency exception). The commission approved each authorization by motion and voice vote.

On finance and contracts the commission approved claims that included a jail-construction payment to Beggenhauer Construction for $473,003.58 and a payment to Architect Inc. for $6,008.81 (total reported $480,002.39). The body also approved a lodging claim in the consent batch and payroll/salary warrants totaling $815,008.44 as presented in the packet.

Personnel and other administrative actions included authorization to advertise and hire a full-time deputy in the sheriff’s office to fill a vacancy, and a one-year agreement to continue partial reimbursement of the county CVSO salary by the South Dakota Department of Veterans Affairs (reimbursement for communities 20,000–50,000 population listed as $4,812.50). The commission approved two tax refund/abatement requests (record #19211, $257.18; record #20057, $22.02).

The meeting concluded with the commission voting unanimously to enter executive session under the statute cited in the record for security and personnel matters; the chair indicated no action was anticipated following the executive session.

Votes recorded in the audio/transcript were by voice; the record does not include a roll-call tally attached to each motion in the transcript.