Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Get email alerts on the Stormwater Infrastructure topic
No spam. Unsubscribe anytime.
McAllen completes Balboa Acres slough improvement to reduce neighborhood flooding
Summary
City of McAllen engineering director Eduardo Mendoza announced completion of the Balboa Acres Slough Improvement Project, which replaced 50 manually operated sluice gates with modern check valves and upgraded headwall, spillway and erosion controls to reduce backflow and flood risk.
Get email alerts on the Stormwater Infrastructure topic
No spam. Unsubscribe anytime.
City of McAllen engineering director Eduardo Mendoza announced completion of the Balboa Acres Slough Improvement Project, saying the work will reduce the risk of flooding in nearby homes and streets.
Mendoza said the upgrades are part of the city’s broader effort to strengthen its drainage network and lessen the impact of severe weather on neighborhoods. “The Balboa Acres upgrades are an example of how strategic engineering and smart design can deliver reliable automatic protection for our community,” he said.
He described the core technical change as the replacement of 50 manually operated sluice gates with modern check valves. “These new check valves will prevent backflow during heavy rain events, reducing the risk of flooding in homes and streets nearby,” Mendoza said. City staff also upgraded the headwall and spillway and installed erosion-control measures intended to improve long-term stability and performance of the drainage system.
Mendoza noted that such improvements are often not visible to residents but said they make a lasting difference for safety and quality of life. For more information on the project, he provided the engineering department phone number: 681-1151.
The announcement did not include additional details on project cost, timeline for related projects, or funding sources.

