Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Goshen board approves Part 3 EAF outline for Jessup Switch Road warehouse after traffic, water and bonding concerns
Summary
The Planning Board advanced the amended site plan for a proposed warehouse on Jessup Switch Road, approving the Part 3 EAF outline subject to consultant and town comments after discussion about wetlands, a reduced building footprint (120k→100k ft²), road‑widening obligations and water/well testing protocols.
The Town of Goshen Planning Board on Dec. 18 voted to approve the Part 3 EAF outline for an amended warehouse site plan on roughly 30.5 acres along Jessup Switch Road and Pumpkin Swamp Road, allowing the applicant to proceed with required Part 3 studies (grading, stormwater, traffic and pump tests) while the board’s consultants refine comments.
Applicant engineer Ross Stolovitz told the board that a recent wetland delineation confined mapped wetlands to a small pocket at the west side of the site; as a result the proposed building was reduced from about 120,000 square feet to roughly 100,000 square feet and moved away from the pocket.…
Already have an account? Log in
Subscribe to keep reading
Unlock the rest of this article — and every article on Citizen Portal.
- Unlimited articles
- AI-powered breakdowns of topics, speakers, decisions, and budgets
- Instant alerts when your location has a new meeting
- Follow topics and more locations
- 1,000 AI Insights / month, plus AI Chat

