Zoning commission approves expansion of auto body shop at 9779 Hooper Road
Summary
The zoning commission approved a conditional use permit (case 250002) authorizing an expansion of an automobile body shop at 9779 Hooper Road; the applicant said the addition would roughly double the shop’s footprint and that flood-elevation rules and landscaping requirements would apply.
Get email alerts on the Conditional Use Auto Body Shop topic
No spam. Unsubscribe anytime.
The Zoning Commission voted to approve a conditional use permit for an automobile body shop at 9779 Hooper Road (case 250002), allowing the permittee to expand the existing shop.
Staff told the commission the request "meets the minimum requirements for consideration by the zoning commission." Applicant Richard Luke Waggly described plans to add approximately another 5,000 square feet to an existing roughly 5,000-square-foot metal-roofed structure, saying the addition would be to the rear, "so we're gonna double the size of the shop." He said the project would include a dumpster enclosure and front landscaping.
Commissioners asked practical questions about parking and site conditions; staff noted previous approval in 2021 had expired for failure to pull permits. The applicant discussed floodplain elevation constraints: he stated his slab height is at 55 feet and the base flood is 58 feet, and he told the board that "if the addition cost 45 percent less than the current value of the building" certain elevation rules would apply. On the record he said the building’s current value was $315,000 and that the addition cost was "right at $1.30" (transcript). Chair and commissioners confirmed the applicant has obtained flood insurance.
A motion to approve, made by Mister Pino and seconded by Mister Frodeau, passed on roll call. The commission approved the conditional use permit with conditions and standard compliance requirements; the applicant thanked the board.
Next steps: with zoning approval, the applicant must satisfy permitting, building code and elevation requirements before construction and maintain required landscaping and dumpster enclosure details as discussed.