Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Wastewater Infrastructure topic

No spam. Unsubscribe anytime.

Select Board approves $17,394.69 for wastewater plant gearbox and brake replacement

Skowhegan Select Board · December 10, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board authorized up to $17,394.69 from the water pollution control capital reserve for an electric motor brake and wash‑press gearbox replacement to keep the wastewater plant running; vote was 5–0.

The Select Board approved a capital repair expenditure of up to $17,394.69 to replace an electric motor brake and wash‑press gearbox at the town’s wastewater plant.

Donnie (Donald) Zalewski described the equipment’s function and why replacement is needed, explaining the step-screen and wash-press remove and compact rags and debris, and that the back page shows a 75% volume and weight reduction after processing. Staff said the machine has been in service about 20 years and a recent inspection revealed gearbox and brake damage; board members emphasized the equipment is essential and the town is legally obligated to keep treatment processes operational. A motion to allow the expenditure passed 5–0.

The purchase will come from the water pollution control capital reserve (current balance cited as approximately $104,000). Staff said the supplier offered a 10% discount on the gearbox and that alternatives (rebuild kits) might be shorter-lived than a replacement.