Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Get email alerts on the Meeting Votes topic
No spam. Unsubscribe anytime.
Votes at a glance: January 2026 Chelsea Traffic and Parking Commission
Summary
The commission tabled the December minutes, approved EV charger locations and temporary intersection safety improvements, approved a mobile coffee-trailer permit and a handicap parking space, moved a Crescent Avenue parking-removal proposal to public hearing, and tabled a speed-bump and a four-way-stop item to later meetings.
Get email alerts on the Meeting Votes topic
No spam. Unsubscribe anytime.
Here are the formal actions the Chelsea Traffic and Parking Commission recorded on Jan. 6, 2026, based on the meeting transcript.
- Tabled approval of the December 2025 minutes so staff (Elsa) could make edits (motion to table carried by voice vote).
- Approved installation of EV chargers at four locations: 4 stalls at Highland and 2 stalls each at Crescent Avenue, Cabbage Street and Washington Avenue, with a 12-hour EV-only window (8 a.m.–8 p.m.). Motion made by Staff member (S5) and seconded by Moderator (S1); vote recorded by voice as "Aye." (Transcript does not specify individual member vote counts.)
- Tabled the speed-bump request for 140 Essex Street to March pending a study (motion carried by voice vote).
- Approved a one-year permit for a mobile coffee trailer to operate at the Chelsea Square spot on 2nd Street (application filed by Monica Roscoe per the agenda). Motion made and seconded; vote recorded as "Aye." Permit duration: one year; vendor must renew.
- Approved a handicap parking space for Manuel Otanez (157 Highland Street). Motion made and seconded; vote recorded as "Aye." (Transcript does not list roll-call vote tallies for these items.)
- Moved Crescent Avenue parking-removal and sidewalk proposal (Crescent from Lewis to Carroll) to a public hearing for further review (motion carried).
- Re-approved the MBTA Broadway at 4th bus-berth reconfiguration (change from one berth to two) and will forward to city council.
- Tabled the Williams & Wannosemit four-way stop request to April pending MassDOT study results.
- Approved temporary painted curb extensions and flexible posts at Broadway/Shortliffe/Marlborough as an interim safety measure; staff will monitor results and consider permanent curb realignment as part of the reimagined Broadway project.
Notes about the record: the transcript records voice votes and "Aye" responses but does not provide a roll-call or numeric tallies for several motions; where a specific mover or seconder is not identified in the transcript, the entry records the speaker labels used in the meeting (for example, Staff member (S5) or Moderator (S1)).