Citizen Portal

Get email alerts on the Stormwater topic

No spam. Unsubscribe anytime.

Council approves preliminary design work to study dredging for Riviera Bay canals

City of Saint Petersburg City Council · December 11, 2025

Summary

Council approved 30% preliminary design work for dredging Canals 11 and 12 after engineering staff described a bathymetric and sediment analysis and permitting study; Riviera Bay neighbors urged action to address sedimentation and recurrent flooding.

City engineering staff presented preliminary design and scoping work for dredging Canals 11 and 12, which manage drainage from inland neighborhoods toward Tampa Bay. Staff said the work would include bathymetric surveys, sediment analysis and a permitting strategy to clarify relationships among DEP and U.S. Army Corps jurisdictional requirements.

Council member Gabbard framed the request as an implementation step arising from the Resilient St. Pete walking tours; engineering said the study will produce a repeatable process for future canal work. Vanessa Puglisi, president of the Riviera Bay Civic Association (participating by Zoom), told the council the neighborhood had documented rising sedimentation and more frequent flooding over recent years and welcomed the focus on Canals 11 and 12 as a first step.

Council voted unanimously to approve the preliminary design work (30% design limit) and requested staff continue community outreach and permitting coordination.

AI generated

The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.

AI can make mistakes, so if you spot one, and we will fix it for everyone.

Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.

Source