Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Drainage board approves temporary concrete plant plan for site on State Road 62
Summary
Project engineer Jim Morley Jr. presented drainage plans for a temporary concrete plant east of the E and B asphalt plant; the board approved the detention-basin arrangement and drainage swales, finding the design meets required storage volume.
Jim Morley Jr., project engineer, told the board the proposal is for a temporary concrete plant along State Road 62, immediately east of the E and B asphalt plant, with all onsite facilities mobile and an off‑site detention basin at the north end of the property. He described design measures intended to capture south‑to‑north runoff and said the basin as…
Already have an account? Log in
Subscribe to keep reading
Unlock the rest of this article — and every article on Citizen Portal.
- Unlimited articles
- AI-powered breakdowns of topics, speakers, decisions, and budgets
- Instant alerts when your location has a new meeting
- Follow topics and more locations
- 1,000 AI Insights / month, plus AI Chat

