Friendswood council postpones rezoning and future land use amendment for 4700 block of FM 2351 after residents raise traffic, noise and drainage concerns
Summary
After lengthy public comment from property owners and residents, the council voted to postpone a combined future land use map amendment and rezoning to a planned unit development for roughly 29.37 acres at the 4700 block of FM 2351 to allow staff and the developer to address traffic, drainage, buffering and phasing questions.
Get email alerts on the Land Use Rezoning topic
No spam. Unsubscribe anytime.
The Friendswood City Council postponed consideration of a combined future land use map amendment and rezoning for about 29.37 acres in the 4700 block of FM 2351 after residents and nearby property owners urged the council to pause for more analysis of traffic, noise and drainage impacts.
Residents and business owners living next to the proposed site said the change would upend a long-established industrial corridor. Nicholas Deutsch, who identified himself as a developer and representative of nearby property owners, told the council the area was annexed and zoned industrial decades ago and warned the proposal would allow a high-density residential project adjacent to existing industrial uses. "We're we're proposing 391 apartment units," Deutsch said when describing the scale opponents expected; speakers said such intensity would strain the single existing access drives and interact poorly with Clear Creek High School across FM 2351.
Multiple speakers echoed concerns about traffic safety, stormwater detention and property compatibility. Ellison Frias, an owner at Garage Ultimate, cited daily congestion and described difficulty for teen drivers entering the high school; another resident recounted significant past flood damage to a home and said drainage remained a major worry.
Representing the applicant, an engineer from EHR explained the proposal as a mixed-use planned unit development. Jeff Rutay and Jeff Boutte said the concept plan calls for separation and buffers between existing industrial uses and new residential buildings. Boutte said the revised concept includes a "70 foot residential structure setback from the property line and then established a 20 foot mature tree buffer," and added the developer is willing to expand those buffers if council requires them. The applicant also said a traffic impact analysis and drainage studies would be required before site development could proceed and that the project could participate in a proposed regional detention facility to reduce on-site ponding.
Council members pressed the applicant on several technical points, including: how phasing would protect against apartments being occupied without the planned commercial frontage, whether buffers and tree belts would adequately reduce industrial-to-residential noise, and whether the proposed dedication of right-of-way and private easements would reliably create a 60-foot corridor for emergency access. Staff and the applicant said phasing language and performance standards could be written into the PUD and that certificates of occupancy (rather than permitting alone) could be tied to commercial build-out as a condition.
After extended discussion the council voted to postpone the ordinance and ask staff and the developer to return with clarified phasing commitments, noise/decibel mitigation measures and more detailed circulation and drainage assurances. Council recorded the motion to postpone and approved it by voice vote; no final rezoning or land-use change was adopted at the meeting.
Next steps: the applicant and city staff will coordinate to draft more specific PUD text and phasing conditions for a future council meeting.