Utica council approves dumpster variance at 45675 Van Dyke with building and fire conditions

Utica City Council · January 14, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

After hearings and safety input, the council approved a variance allowing a dumpster at 45675 Van Dyke but required building-department and fire-prevention approval and protective measures for a nearby gas meter.

The Utica City Council on Jan. 13 approved a variance to allow a commercial dumpster at 45675 Van Dyke, subject to conditions from the building department and the fire prevention bureau intended to protect a nearby gas meter and ensure safe egress.

Applicant Jeff Orlando told the council he had "nowhere else to put the dumpster," describing tight site constraints and access to a rear door. Council members and staff examined photos and logistics during the public hearing and deliberations.

Fire staff raised a particular safety concern: the existing dumpster location sits adjacent to the building's gas meter. As the fire chief noted during the meeting, the dumpster location is "literally 2 feet or 2 and a half feet off of the gas meter for that building," prompting suggestions that the applicant install a noncombustible enclosure and a guard to protect the meter.

Councilmember Diane moved to approve the variance with the condition that the building department and the fire prevention bureau sign off on a protective enclosure/guard and any required dimensions; Councilmember Torenzi supported the motion. A roll-call vote recorded all members voting yes and the motion carried.

Implementation details: The council directed the applicant to work with the building inspector and the fire prevention bureau to identify acceptable enclosure materials and placement that preserve emergency egress from a rear door. The approval is conditional on compliance with those departmental requirements.

What happens next: The applicant must secure explicit approvals from building and fire officials and install the protective measures before the variance is effectively implemented.