Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Building Renovation topic

No spam. Unsubscribe anytime.

Board approves renovation at 308 South George Street with railing requirement

York City Historical Architectural Review Board · January 9, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board approved exterior renovations at 308 South George Street, accepting composite windows and door repairs, requiring specified railing profiles and composite rail components, and advising appropriate mortar for brick repointing.

The York City Historical Architectural Review Board approved the exterior renovation plan for 308 South George Street on Jan. 8, including a specific requirement for porch railing profile and cap.

Dan Gibson (Speaker 5), who said he purchased the property from the RDA and stabilized it, presented plans to restore a 6-over-1 window pattern with Anderson 100 FiberX composite windows, repair or replace trim in wood where appropriate, and retain slate on the front porch. Gibson said composite windows reduce long-term maintenance but cost more than vinyl, and he estimated composite windows were about $300–$400 more per window.

Board members discussed masonry repairs and advised sampling for mortar and using a High Line mortar (low Portland cement) to prevent spalling when repointing historic brick. Members also discussed reconstructing a missing balcony and the rail and baluster profile; the board identified preferred profiles (including previously used composite profiles) and provided product/profile references. Speaker 3 moved to approve the application as submitted with the additional requirement that the railing and cap match the discussed profile; Speaker 2 seconded, and the board approved the motion by voice vote.

The board’s approval requires the applicant to supply the specified railing profile (board referenced 8840PF/8841PF and 1-1/4-inch square balusters as a suitable profile example) and to submit final material samples and mortar test results for staff review before final permitting.