Facilities update: Burns High boiler leak, ADA concrete issues, maintenance vacancy
Summary
District facilities staff reported a glycol leak in a Burns High boiler operating the school on a single boiler, concrete and ADA-accessibility problems at multiple sites, and an open maintenance supervisor position at Pine Bluffs.
Get email alerts on the Facilities topic
No spam. Unsubscribe anytime.
Lance, identified in the meeting as the facilities presenter, reported several operational items. He told the board the custodial team had "installed some sanitizer alarms on dishwashers, to comply with health requirements," and that gym lights were replaced and a new scoreboard installed. Lance said the district is "operating under 1 boiler right now, which is problematic" at Burns High School after a glycol leak; a gasket repair is planned the following week.
Lance described concrete and ADA-accessibility needs at Burns High (front area), Pine Bluffs High School and the district administration building parking lot and said an engineer had been consulted. He also said alternative bus routes have been created and are ready if needed, and that applications remain open to fill a maintenance supervisor vacancy at Pine Bluffs, with interviews anticipated.
The presenter emphasized the district caught the boiler leak before it became more serious and that staff are preparing fixes and project planning. No project budgets, contractor names or firm timelines beyond a forthcoming interview schedule for the maintenance supervisor were provided in the transcript.