An applicant seeking to rebuild a commercial building presented an updated site plan showing a proposed sewer lateral and an ADA restroom; staff said state law allows rebuilding to prior footprint but asked for an updated site plan and memos, and placed the item on the next planning‑commission calendar for review.

An applicant identified as David presented a site‑plan amendment for a commercial property that had suffered a fire and said utilities (water and gas stubs) exist but the sewer lateral and a new ADA restroom are proposed. Staff asked for an updated site plan showing the utilities because prior records did not clearly show the laterals or service connections.

Jenny Knight noted that state law protects a property owner’s right to rebuild the structure as it existed, but the city requires an updated site plan if new utilities or an interior restroom are being added. The applicant said an 8‑ to 10‑inch sewer main is stubbed in nearby, and proposed to run an 8‑inch main with a 4‑inch connection for the new fixtures; staff warned that if a main serves multiple owners the line would be required to be dedicated to the city and include a manhole rather than a cleanout.

Tyler Seaman, the building inspector, will review building permit sequencing and what work can proceed before formal planning commission approval. The city agreed to put the site plan on the next planning commission agenda (the staff indicated the next meeting date) so preliminary and final approvals could be considered concurrently if the application is complete.

Next steps: the applicant will submit updated site drawings, engineering memos and slope/callout details; staff will provide memos to the building inspector and place the item on the planning commission agenda for formal review.