Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Authority approves up to $53,735 for temporary concrete blocks to limit vehicle access at Del Norte County transfer station

Del Norte Solid Waste Management Authority · January 21, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The authority authorized contracting with DDR Cleaning and Hauling to place stacked temporary concrete blocks at a back property adjacent to the Del Norte County transfer station to deter vehicular access linked to encampments and property damage; board approval was conditioned on securing any required permits.

The Del Norte Solid Waste Management Authority voted to authorize staff to contract with DDR Cleaning and Hauling to place temporary, stacked concrete blocks at a back parcel adjacent to the Del Norte County transfer station to prevent vehicular access that staff said has led to encampments, tree cutting and site damage.

Director Ward told the board the blocks would be stacked two‑high and are intended as temporary, removable perimeter control that can be placed or removed in a day with appropriate equipment. Ward said staff will not begin installation until any required permits…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans