Committee flags King(s) Valley/Allendale and other intersections, and new BLTS concerns for bicyclists
Summary
The advisory committee identified several intersections projected to exceed mobility targets by 2045 (Leavens & Bellandale; Ellendale & Kings Valley; a Villa-area intersection) and added Allendale & Kings Valley to the BLTS intersection analysis because intersection geometry increases bicyclist stress.
Get email alerts on the Intersection Capacity topic
No spam. Unsubscribe anytime.
Committee members and project staff said model outputs identify a handful of locations that will not meet mobility targets under the baseline future-conditions scenario and discussed how to address those problems.
Erica (a presenter on the multimodal analysis) told the committee that three intersections are likely to exceed their mobility targets by 2045: Leavens & Bellandale, Ellendale & Kings Valley on Kingstell Highway, and one location near Villa. She also said two additional locations are close to thresholds and could see congestion.
The team added intersection-level bicycle level-of-traffic-stress (BLTS) analysis at Allendale & Kings Valley after finding that while segment-level BLTS appeared moderate, the intersection maneuvers exposed bicyclists to high-stress conflict zones. "Once you're actually in that intersection...the bicyclist is essentially exposed to the vehicle," the presenter said when explaining why the intersection was flagged.
Committee members proposed targeted mitigations: operational signal upgrades, complex striping and green paint through conflict zones, bicycle signal heads or a protected intersection and additional street connections to offload demand. Jason recommended adding a separate bicycle signal phase at Kings Valley & Ellendale to reduce exposure; the presenter said such options will be evaluated during intersection control or signal studies.
Why it matters: These intersections influence travel reliability, safety and multimodal access across the city; options include capital signal work, redesigns (roundabouts or protected intersections), new street links to redistribute traffic, and changing mobility targets where justified by local circumstances.
Next steps: The project team will carry intersection candidates forward for more detailed operational evaluation and incorporate committee feedback into the draft TSP materials for public review.
AI generated
The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.
AI can make mistakes, so if you spot one, and we will fix it for everyone.
Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.