Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Get email alerts on the Roads topic
No spam. Unsubscribe anytime.
Residents urge council to include active-transportation teams, warn about crushed-asphalt surfacing
Summary
Public commenters told the Blufftown Council to coordinate with UDOT and active-transportation planners before road work, arguing crushed-asphalt surfacing and layout choices could worsen speeding and drainage problems; staff clarified the surface will be crushed asphalt (a gravel-like recycled material), not paved.
Get email alerts on the Roads topic
No spam. Unsubscribe anytime.
Blufftown — Residents at the Blufftown Council special meeting pressed the council to coordinate road work with active-transportation teams and to prioritize traffic-calming design over low-cost surfacing.
Lou Anne Park told the council she appreciates efforts to save money but urged officials to "bring those teams in when you have a project and get some input," saying active-transportation planning — including input from UDOT — should inform road design. She urged narrower lanes, curves and other traffic-calming features so neighborhood streets do not become "racetracks."
A separate resident raised safety concerns about speeding on 2nd East and described seasonal runoff that turns portions of the road into a "river" twice a year. That resident asked whether drainage planning accounts for large water flows and whether the chosen surfacing would migrate under heavy runoff.
Responding, Jennifer Dodler (staff) apologized for earlier wording in a neighbor email and clarified the town plans to use "crushed asphalt," which she described as a pulverized, recycled material the size of gravel. "It's not gonna be paved," Dodler said, adding the work is intended to build up the road base, reduce potholes and improve drainage. Staff said construction management will include Jones and Demille and that Sondregger (contractor) is aware of local road-construction standards.
Council members and residents asked staff to pay particular attention to drainage near problem spots and to verify utility locations (Bluff Water Works was noted as having water lines on 2nd East). Staff said they would reach out to utility owners and construction managers to confirm pipe depths and drainage measures before work proceeds.
The council then closed public comment and moved on to business items.
