City recommends Oates Associates for Stony Brook Drive culvert design; $21,000 unbudgeted expense to stormwater plan

City of Dardenne Prairie Board (work session) · June 5, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

To prevent county mill-and-fill work from being interrupted, staff recommended awarding Oates Associates a $21,000 design contract to replace three failing CMP culverts on Stony Brook Drive with HDPE triple-wall pipe; the cost will be charged to the stormwater master plan budget and requires a future budget revision.

The city engineer asked the board to approve two readings so the Stony Brook Drive culvert replacement can proceed quickly ahead of a county mill-and-fill project. The city received two proposals and recommended awarding design services to Oates Associates for $21,000. The engineer described three corrugated metal pipe (CMP) culverts beneath Stony Brook Drive that have rusted and begun to fail; staff proposes replacing them with HDPE triple-wall pipe, which the engineer said lasts longer and costs less over time.

The $21,000 design contract is not currently budgeted; staff intends to charge the cost to the stormwater master plan, which has a $150,000 allocation, and to revise the budget to reflect the expense. The design contract covers engineering only; construction will be a separate contract, and staff emphasized timing is critical because the county’s planned milling and resurfacing requires the culvert work be completed first.

Board members had no objections to advancing the item for ordinance consideration with two readings to meet the county’s schedule.

Next steps: staff will finalize the design contract scope with Oates Associates, revise the stormwater master plan budget, and schedule construction procurement following design completion.