Commission authorizes study for Phase 2 biosolids handling to reduce hauling costs and explore reuse options

Mount Clemens City Commission · September 3, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The commission authorized a study to evaluate dewatering options for biosolids (aiming to increase solids content and reduce hauling/management costs), with staff proposing a report by year-end and possible subsequent design and construction phases.

City staff recommended a Phase 2 study of the city's biosolids handling to examine dewatering processes, capital and operations-and-maintenance costs, and potential end uses. Staff said Phase 1 reduced sludge to roughly 20% solids and Phase 2 aims to explore options to reach about 70% solids to reduce hauling volume and cost.

A staff presenter (identified as Maria) explained that the study will examine processes that fit the plant's layout and provide capital and O&M cost estimates for viable options; potential outcomes include cheaper disposal, potential agricultural reuse where permissible, or other beneficial reuse if feasible. Maria said, if approved, the consultant would start immediately and staff hoped to have a report by the end of the year or early next year.

Commissioners acknowledged the technical complexity and the possible long-term operational savings and approved moving forward with the study with the expectation of a future design and construction phase depending on recommendations.