Summary

At a public meeting Aug. 13, Kanosh residents criticized a proposed water-rate package that would raise the base rate and sharply increase usage tiers; town officials said the increases would cover loan payments for a delayed well project and rising repair costs.

Kanosh — Residents at a public meeting on Aug. 13 pressed town officials over a proposed increase in water rates that officials say is necessary to cover higher operating costs and loan repayments for a delayed well project. Speaker 1, the meeting moderator and town official, presented rate options and financial projections and said the town faces a shortfall at current rates.

"At our current billing rate, we lose $62,960," Speaker 1 told the meeting, describing three options: a modest adjustment that would roughly break even (about $17,000–$18,000 net), and a larger proposal the town showed that would net roughly $50,000 annually if costs do not rise. The projections include loan payments for work tied to bringing a newly drilled well and chlorination system online.

Many residents expressed alarm at the scale and pace of the proposed increases. "I don't understand why ... it's proposed 50% increase," said Speaker 12, a high-usage customer, adding that a large single jump would be untenable for many households and that gradual increases would be more manageable. Several others urged a smaller base-rate increase spread over years rather than steep escalators in higher usage tiers.

Technical and operational issues were central to public comments. Speaker 2 urged the council to enforce a strict meter-reading schedule (within "a day or two") to avoid bills that misstate usage. Speaker 7 described a case where a household leak lasted months and said delayed readings and late billings masked lost water and cost to the town. Speaker 16 asked why customers who paid for new meters still lack working installations; Speaker 1 estimated the town was "about four meters" behind on installation and acknowledged some parcels are being billed on a single meter when two should apply.

Officials explained some delays and cost increases stem from the town's well project. Speaker 1 said the well hole has been drilled and the town is in the bidding process to build a chlorination plant and install a pump; work had been delayed by water-rights redefinition and the COVID-era supply-price increases that roughly doubled some project costs. "The project has moved forward the entire time," Speaker 1 said, and officials expect the well to be operational by spring if bids and financing proceed.

Residents also pressed for transparency on how proposed new revenue would be spent. Speaker 11 and others asked for a line-item breakdown of projected expenses (equipment, labor, repairs, loan payments). Speaker 1 and Speaker 6 said a more detailed study exists (prepared by rural water) and materials have been posted and distributed; attendees requested the budget and supporting backup be made readily available to the public.

Several commenters noted usage concentration: council or staff speakers said roughly two-thirds of connections are at the base rate while about 5% of users account for roughly 25% of total water use. The concentration was cited by officials as rationale for steeper tier pricing to discourage industrial-scale consumption on the culinary system.

Other issues raised included annexation and growth concerns, the town's practice of sharing or permitting county crews to use water for road work, and whether hydrant fills have been monitored; Speaker 17 relayed an observation of apparent unauthorized hydrant use, and town representatives said the county can be charged but often the administrative cost outweighs billing large projects for occasional uses.

No formal vote was taken at the public meeting. Speaker 1 closed the hearing and moved the council into its regular meeting, saying the proposals shown were "a worst-case scenario" and that the council will consider public feedback, adjust options and discuss the matter further before any final action. Speaker 4, speaking from the dais, said he supported raising the base rate to $31 but would not back the large tier escalators as proposed.

The council did not adopt any changes at the public meeting; next steps are further review of the rate study, potential adjustments to the proposed structure and formal consideration in a forthcoming council session. Residents asked that detailed budget backup and the rate study be made publicly available before any final decision.