Citizen Portal
Sign In

Lifetime Citizen Portal Access — AI Briefings, Alerts & Unlimited Follows

Aurora finance panel approves multiple contracts, grants and purchases including Verizon credit, Microsoft true-up and new 9-1-1 consoles

Aurora Finance Committee · December 12, 2025

Loading...

AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The committee approved several routine but budget-significant items: Verizon cellular award with a $392,000 retention credit, a $303,804 Microsoft true-up, $457,821 for L3 Harris 9-1-1 consoles, road and engineering agreements, insurance renewals totaling about $3.04 million, and multiple grant acceptances.

The Aurora Finance Committee voted unanimously on a package of procurement and grant items on Dec. 11 that included technology purchases, roadway agreements and insurance renewals.

Key approvals included:

- A cellular service award to Cellco Partnership (DBA Verizon Wireless) under the state contract that includes a one-time retention credit of $392,000 intended to offset much of Aurora’s 2026 cellular billing; staff said the credit effectively minimizes the 2026 expense during the credit period and expects bills to resume in late 2026.

- A year-2 true-up under the city’s three-year Microsoft enterprise agreement with Dell Marketing LP for $303,804.24 after negotiation; Deputy CIO Jeff Anderson said this followed a negotiation that reduced an initial higher figure.

- Purchase of new radio/computer consoles from L3 Harris for $457,821.48 to upgrade dispatch hardware and move consoles to a Windows 11–compatible configuration at primary and backup 9-1-1 centers.

- A $60,000 change order with Builders Paving LLC for the 2025 citywide resurfacing (East) project; engineering said higher-than-expected concrete work after winter raised costs but aggregation with another resurfacing bid keeps overall program costs manageable.

- Multiple road project agreements and IGAs related to the Edgeline Drive / BNSF bike path crossing and Indian Trail signal modernization (including HR Green engineering agreements and a small $11,000 permanent easement purchase from BNSF). Engineering staff provided project descriptions and confirmed right-of-way timing will drive construction schedules.

- Insurance renewals for property, general liability and workers’ compensation with a combined premium listed in staff materials of $3,039,022, described as 3.78% lower than the prior year. Insurance brokers from Hub International discussed the city’s self-insured retention ($2,000,000) and recommended further sensitivity analysis before changing retention levels.

- Acceptance of a $22,000 grant from the Metropolitan Mayors Caucus (funded by ComEd) to support low-income energy-efficiency outreach targeting households at or below 80% AMI; staff said the grant aims to engage at least 1,000 income-eligible residents and will cover outreach and Green Fest costs.

- Acceptance of a $75,540.81 grant from the Illinois Department of Transportation STEP program for traffic enforcement overtime and a required lidar purchase order to be placed by Dec. 31.

Most of these items passed by unanimous voice vote or standard motion (recorded motions were typically approved 5-0). Staff said a few items were moved to later meetings and two grant items were held until mid-January.