County buildings director told commissioners that boilers, corroded sprinkler heads and outdated air-conditioning systems at the jail and Cascade Annex need immediate attention; staff will deliver a prioritized plan in about three weeks and discussed funding options including ARPA and the general fund.
Get email alerts on the Infrastructure Repairs topic
No spam. Unsubscribe anytime.
Valley County buildings and grounds staff told commissioners on Feb. 2 that multiple life-safety and mechanical deficiencies at the county jail and the Cascade Annex require prompt action and funding.
Director Canada said the county’s transfer site project is on hold for winter, but her immediate focus is the jail, which she described as having “a lot of mechanical issues” and office-space needs that may require upgrades. She said specialists will be brought in to assess repairs and remodeling options.
The director flagged boilers, failing cooling systems and a roof issue in a Soil and Water conference area. “Scott had fire inspections done last year. I just found out that they found several deficiencies for the Cascade Annex and the jail,” she said, calling the items “must pay, must do” work tied to life-safety and continued operation.
Canada also reported corrosion in sprinkler heads and a required replenishment of glycol for outside sprinklers, which she said increases costs. She gave a budget line for small maintenance items: “For the annex, we have $18,232. And for the jail, it's $2,863 to replace heads and also the glycol in the sprinkler system at the Cascade Annex,” and noted those needs were not included in this year’s maintenance budget.
On cooling systems, Canada said many units use R‑22 refrigerant and “everything will probably have to be retrofitted,” a change that would raise replacement costs. She said contractors previously used would likely need replacement and that overall contractor expenses would “probably” be high; in the transcript she estimated “probably around 150, maybe” but did not specify units or currency.
Practical constraints emerged in equipment replacement: planned washer and dryer units will not fit through existing doorways, forcing a re-evaluation of scopes. Canada outlined two options for kitchen gas service: run a larger 2½–3‑inch pipe across the kitchen (higher labor and pipe costs) or purchase a separate tank for about $7,500 to reduce piping costs.
Commissioners and staff discussed funding approaches. One commissioner suggested using ARPA funds for the annex’s roughly $18,232 estimate; others noted the jail work will ultimately hit the general fund and recommended using the repairs/maintenance account for some items. Canada said she would compile a prioritized package and return with recommendations in about three weeks.
The board did not take a formal vote on specific repairs during the meeting; commissioners directed staff to gather bids, refine scopes and return with budgeted options.