Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Schrader Group presents schematic design for Methacton High School; township review set for Feb. 26

Methacton School District Board of School Directors · January 28, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Design firm Schrader Group and construction manager ICS showed a schematic design for Methacton High School that separates bus and parent traffic, adds a natatorium, auditorium and two-story classroom wing, and reduces teaching stations from 94 to an effective 85 (capacity ~1,604). Township comments are expected this week; planning commission review is scheduled Feb. 26.

Devin Bradbury of the Schrader Group presented a schematic design update for Methacton High School during the Jan. 27 board meeting, saying the district is nearing the end of schematic design (through February 2026) and that a sketch plan has been submitted to the township for review.

Bradbury said the plan separates buses from parent drop-off with three distinct access points and adds two front parking lots (one labeled Lot 8 for staff). Additions shown in the schematic include a new natatorium (pool), an auditorium with flexible seating, a two-story classroom wing, a wellness/fitness center using the pool mezzanine, a fab lab and a life-skills apartment. "We're currently in schematic design, which runs through…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans