Doorwater panel approves stormwater claims and awards maintenance, professional contracts
Summary
On Jan. 27, 2026 the Doorwater Management Commission approved stormwater claims and voted to award annual maintenance and professional services contracts; staff reported 18 projects initiated in 2026 and said ARPA-funded work should be complete by May 31.
Get email alerts on the Stormwater Management topic
No spam. Unsubscribe anytime.
The Doorwater Management Commission approved a claims docket and voted to award multiple stormwater-related maintenance and professional services contracts at its Jan. 27, 2026 meeting.
Unidentified Speaker 1 opened the meeting and presented the claims docket, which included listed disbursements such as Keller Beach ($2,575), Salt Creek Valley County Subdivision ($12,818.20) and Internal Run Subdivision ($775). After a motion and second, a voice vote was held and the motion carried, with Speaker 1 recording “Aye.”
Speaker 2, identified in the transcript as a staff presenter, introduced an annual maintenance and construction services agreement covering Feb. 1, 2026–Jan. 31, 2027 and named proposed contractors: The Dalton Inc; Green Line Landscape and Estimating; Heritage Drone Services LLP; Johns Brothers Hylian Estimating Inc; and K and L Estimating LLC. Following a motion and second, the commission approved the contract awards by voice vote.
Speaker 2 then presented a separate annual professional services agreement for stormwater-related technical work for Feb. 1, 2026–Feb. 31, 2027, listing proposed firms including Advanced Engineering Services Inc; American Structural Queen Inc; Butler, Fair and Super Inc; Christopher Bieber Engineering Ltd; ELD Indiana Inc; JCMA Inc; and SWCA Environmental. That motion also passed on a voice vote.
In a program management update, Speaker 2 said, "So far to 2026, we have initiated 18 projects to date," and summarized how recent concerns have been handled: "80 of those concerns resulted in a project of some sort," with 23 concerns moved to stormwater projects (drain repairs, sinkhole repair, detention-basin work), 17 nuisance wildlife projects (beaver-related), two items linked to an ongoing drainage study in High Metal Special Subdivision, and 38 concerns tied to the Porter County Highway Department for right-of-way cleaning or vendor-related right-of-way issues. Speaker 2 credited Gloria Larson as the project manager who "manages our drainage concern portal."
Asked about the top priority, Speaker 2 said the Rolling Head subdivision storm sewer reconstruction (detention basin on Angelica Court and work along Garrett Drive) is the highest-priority capital project and is in design; the staff hopes to advertise the bid in March and move to construction later this year. On the remaining ARPA-funded work, Speaker 2 said, "All of those would be completed, I would say, by May 31."
What the commission approved: voice votes were used for the claims docket and both sets of contract awards; the transcript records motions, seconds and an affirmative voice vote but does not list individual roll-call tallies or the names of the motion makers beyond the generic Speaker labels.
Next steps: design work and the bid schedule for the Rolling Head project, completion of final punch-list items for ARPA projects before the May 31 target, and execution of awarded contracts and professional services agreements.
Sources: Meeting transcript of the Doorwater Management Commission, Jan. 27, 2026 (Speakers 1 and 2).