Summary

The Sykesville Historic District Commission approved application 2025-17 to replace two deteriorated roof sections at Old Town Motors, allowing in-kind asphalt shingle replacement and a white TPO replacement for a rubber section; staff had authorized emergency repairs before HDC review.

The Sykesville Historic District Commission voted to approve application 2025-17 on Dec. 17, 2025, allowing partial roof replacement at 7415 Springfield Avenue to address leaks and deterioration.

Kevin, a town staff member, told commissioners the proposal would replace the asphalt-shingle section in kind and swap the leaking torch-rubber section for a white thermoplastic polyolefin (TPO) material that the contractor offered. He told the commission that both sections are only partially visible from public rights of way and that staff had granted the applicant permission to begin emergency repairs before formal HDC approval because of the time-sensitive leaks. "Staff felt that the request was appropriate and could be approved as presented," Kevin said.

Commissioners moved and seconded the application and approved the motion. Speaker 3 initiated the motion to approve the application as presented and the Chair called the voice vote; the motion carried.

The approval allows the applicant to proceed with the specified materials and repairs. The HDC record notes the commission's general guideline that original roof shapes, details and character-defining elements should be preserved where feasible and that replacement materials should resemble the existing in size, orientation, color and reflectivity when repair-in-kind is not feasible.

Next steps: the applicant may continue the roof repairs already authorized by staff while the HDC's approval is recorded in the commission's files.