Summary

A ski‑area contractor offered to donate and have subcontractors build a heated, three‑stall flush restroom at the Summer Road trailhead on Forest Service land. Council gave consensus direction to staff to pursue the Forest Service special‑use application and to negotiate ownership and maintenance arrangements.

A ski‑area contractor (referred to in the meeting as Big Dee / Big T) told the council it would coordinate subcontractors to donate and construct a heated, three‑stall flush restroom near the Summer Road trailhead. The proposed building would be utility‑connected (water, sewer and power), sited to minimize parking interference and designed to be built into the bank to reduce avalanche exposure.

Town staff and ski‑area representatives said key open items include: who will formally own the facility on Forest Service land, how operations and maintenance (O&M) costs will be shared, and whether the town can provide the Forest Service a liability/indemnity letter saying the structure need not be designed to withstand a full avalanche (the contractors preferred to accept replacement risk rather than build an avalanche‑proof structure).

Council direction and process

Council members indicated broad support for the donation and discussed that the town could be the special‑use applicant for the Forest Service permit; the staff noted a special‑use permit application must be in the Forest Service's hands by the end of the year to enable construction next summer. Given the timing, the council provided a motion and head‑nod consensus directing staff to proceed with the application, with the understanding that a future budget amendment and formal ownership/operation agreement would follow.

Operational considerations

Staff emphasized they need to work out maintenance, winterization, pumping/plumbing resilience in extreme conditions and the long‑term funding arrangement (staff suggested a 50/50 starter share with the ski area was under discussion). Staff and council also requested engineers and the Forest Service review design and site surveys; the Forest Service indicated it can fast‑track NEPA/NEPA‑type surveys if preliminary design and application materials are provided quickly.

Next steps

- Staff to work with the ski‑area contractor and engineers to prepare the Forest Service special‑use application by the end of the calendar year. - Staff to draft a letter regarding avalanche design liability for the engineering firm and prepare a proposed O&M cost‑sharing approach for future council approval.