Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Trails topic

No spam. Unsubscribe anytime.

Parks board approves up to $2,500 match for Crimson Dawn trail realignment

Natrona County Parks Board · February 13, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Trustees approved spending up to $2,500 from the parks budget to match funds raised by the Crimson Dawn Association for a $5,000 trail realignment that will reduce erosion and improve safety; Central Wyoming Trail Alliance will provide labor and equipment.

The board voted to contribute up to $2,500 from the trails budget to match funds raised by the Crimson Dawn Association for a proposed realignment of the eroded trail from the parking lot up to Crimson Dawn cemetery. Parks Director Michael Brown described the proposal as a minor realignment that lengthens the trail to reduce erosion, allows erosion control features and reduces grade; the estimate for the work is about $5,000.

Brown said Central Wyoming Trail Alliance would perform much of the construction with small equipment and that the parks trail budget appears to have adequate funding to cover up to $2,500. Trustees moved, seconded and voted to approve the match so the association can proceed with fundraising and construction planning; Brown said work would likely begin in April or May, weather permitting.

Trustees noted the new trail would not be ADA-compliant given terrain constraints but would improve safety and summer access for event attendees.