Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Grants And Contracts topic

No spam. Unsubscribe anytime.

Council introduces grants and contracts for traffic upgrades, bridge work and recreation funding

Pittsburgh City Council · January 13, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Council introduced resolutions for a $1.394M PennDOT 'Green Light Go' grant (with $348,507.27 city match), a $19,580 CSX engineering agreement (reimbursable), and a gaming tourism fund grant up to $50,000 for Warrington Recreation Center; these items were introduced and referred to committee.

PITTSBURGH — On Jan. 13, Council introduced a set of grant and contract resolutions that would fund traffic signal upgrades, bridge engineering and local recreation projects.

Councilwoman Salin Netro presented Bill 10 to accept a Pennsylvania Department of Transportation Green Light Go grant in the amount of $1,394,029.06 for intersection upgrades at three city locations. The resolution requires a city match of $348,507.27, bringing the total project cost to $1,742,536.33.

Council also introduced Bill 14, a resolution to enter an agreement with CSX Transportation Inc. for preliminary engineering work on the Elizabeth Street Bridge rehabilitation, with a not-to-exceed amount of $19,580 to be reimbursable at 100%.

Councilman Mosley presented Bill 11 authorizing the city to seek gaming economic development tourism funds from Allegheny County, not to exceed $50,000, for Warrington Recreation Center.

None of these measures were adopted at the meeting; they were introduced as papers and will proceed through committee review and a public hearing process.

Provenance: Bills and amounts were read during the papers presentation portion of the meeting (bills 10, 11, 14).