Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Sign Variances topic

No spam. Unsubscribe anytime.

ZBA approves larger and additional ground signs for The Woodlands at Nashua

City of Nashua Zoning Board of Adjustment · October 23, 2024
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board unanimously approved variances allowing The Woodlands at Nashua to replace an aging sign and add a second ground sign closer to the road, permitting two signs totaling 59.57 sq ft where 10 sq ft is normally allowed; members cited safety and wayfinding along Spitbrook Road.

The Zoning Board of Adjustment voted unanimously Oct. 22 to allow The Woodlands at Nashua to install two ground signs and increase sign area at 3 Sapling Circle.

Metro Sign & Awning’s Liz Bastid said the property owner, Campbell Communities, is rebranding multiple properties; the existing sign is old and one replacement would occupy the current location while the second would be placed nearer the road for visibility. "We're asking to replace that sign and put a second sign at the further entrance," Bastid said during the presentation.

Board members compared the requested signage to other nearby senior and residential complexes and found the proposed size and placement consistent with the area’s character. Members noted the site’s speed and traffic on Spitbrook Road made clearer wayfinding appropriate for public safety. The variances were for number of ground signs (one permitted, two proposed), total area (10 sq ft permitted, 59.57 sq ft proposed), front yard setback encroachment, a modest height increase (one sign proposed at 7'3" where 6' is permitted), and a reduced intersection setback (25' required, 10' proposed).

A motion to approve the requested variances passed 5‑0. The board noted the 30‑day rehearing window and advised the applicant to coordinate with Planning Department staff before construction.