Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Lot merger and pool relocation proposed at 40 Upper Road; ADR urges lower retaining walls and engineering review
Summary
Project at 40 Upper Road returned to ADR after June feedback with a proposed lot merger to avoid variance needs, a relocated pool and retaining walls up to 7'6"; ADR members recommended minimizing wall heights, providing engineering (soil cut/fill) and planting plans at formal submittal.
Applicant Shaoqian Trung returned to the Ross ADR on Aug. 20 with a revised conceptual design for 40 Upper Road that proposes merging two adjacent parcels to avoid variance need and relocating a previously proposed pool. The revised plan moves the pool closer to the front/driveway area, relocates it away from a protected oak, and proposes a terrace with…
Already have an account? Log in
Subscribe to keep reading
Unlock the rest of this article — and every article on Citizen Portal.
- Unlimited articles
- AI-powered breakdowns of topics, speakers, decisions, and budgets
- Instant alerts when your location has a new meeting
- Follow topics and more locations
- 1,000 AI Insights / month, plus AI Chat

