Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Lot merger and pool relocation proposed at 40 Upper Road; ADR urges lower retaining walls and engineering review

Ross Architectural Design Review (ADR) · August 21, 2024
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Project at 40 Upper Road returned to ADR after June feedback with a proposed lot merger to avoid variance needs, a relocated pool and retaining walls up to 7'6"; ADR members recommended minimizing wall heights, providing engineering (soil cut/fill) and planting plans at formal submittal.

Applicant Shaoqian Trung returned to the Ross ADR on Aug. 20 with a revised conceptual design for 40 Upper Road that proposes merging two adjacent parcels to avoid variance need and relocating a previously proposed pool. The revised plan moves the pool closer to the front/driveway area, relocates it away from a protected oak, and proposes a terrace with…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans