Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Spokane advisors favor 3-lane Grand Boulevard design ahead of commission vote

Spokane Transportation Advisory/Commission (public meeting) · February 18, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

After a detailed design update on Grand Boulevard, Spokane transportation advisors said the 3-lane configuration (one travel lane each direction plus center turn lane) best balances safety and predictability; Phase 1 is roughly 95% designed and funded, Phase 2 is at 30% and still needs grants.

Spokane transportation advisors spent most of their Feb. 17 meeting reviewing near-final designs for Grand Boulevard and debating two competing cross-section options: a 3-lane design intended to calm speeds and shorten pedestrian crossings, and a 4-lane design that preserves additional uphill passing capacity for trucks.

Colin, the project presenter, said Phase 1 is “about 95%” designed and Phase 2 is roughly 30% complete. He said Phase 1 is funded through a legislative Move Ahead Washington appropriation and could begin in late summer or early 2027 depending on bids. “If we bid it out at the right time… we usually get…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans