Summary

Purchasing staff recommended awarding IFB 40493-25 to Crown Service Contractors for $64,901 plus a 10% contingency ($71,391 total) from Spla 6 funds to replace a failed treated beam and repair brackets at the Veterans Memorial Park pavilion; the board asked about warranty and inspection plans.

Purchasing manager Hannah Milford told the Board of Commissioners on Feb. 19 that testing and repair drawings prepared after a treated structural beam failed at the Veterans Memorial Park pavilion produced an IFB process with five bidders.

Milford said Nova Engineering performed materials testing and prepared repair drawings; staff recommended awarding IFB 40493-25 to Crown Service Contractors for $64,901, with a county-controlled 10% contingency of $6,490 for a total recommended contract amount of $71,391 to be paid from Spla 6 funds. “We respectfully recommend that the board award this IFB to Crown Service contractors in the amount of $64,901,” Milford said, noting Crown showed prior experience on similar structures and would not require a subcontractor.

Commissioners questioned whether the scope included redesigns or coverings to prevent future weather-related deterioration and asked about warranties and future inspection schedules. A commissioner noted the original warranty had expired roughly six months before the beam failure; Milford said the new work’s warranty is expected to be five years. Commissioners suggested scheduling annual inspections to catch deterioration before warranty expiration.