Plan committee approves parking-lot addition for Urology Associates; shoreland permit required

Ashwaubenon Plan Committee · October 15, 2024
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The committee approved a parking-lot expansion at Urology Associates to add patient and staff parking. Staff noted engineering revisions (dumpster relocated), required curbing for new parking areas and that a shoreland permit is required because the work lies within 300 feet of a creek.

The Ashwaubenon Plan Committee approved a site-plan review for a parking-lot addition at Urology Associates, 1385 West Main Street, after staff described engineering revisions and environmental permitting requirements.

Aaron, a staff member, said the project is "in addition to a previously approved site plan" and that the primary need is "additional parking for patients and staff." He reported the applicant and engineer have revised plans to move the dumpster enclosure to comply with setback requirements and that most of the checklist items have been addressed.

Staff flagged two requirements before construction proceeds: all new driveways and parking areas (including landscape islands) must have curbing — conventional curb, pan, or rolled curb — and because the proposed driveway work is within 300 feet of the creek, the applicant must obtain a shoreland permit and ensure erosion-control measures are in place. Aaron also noted proposed landscaping for stormwater areas would use native prairie plantings.

Committee members moved and seconded approval with staff conditions; the motion carried by voice vote. The transcript does not record a roll-call tally.

Next steps: the applicant will finalize engineering revisions, secure a shoreland permit, and comply with curbing and erosion-control requirements before starting construction.