Planning Board receives Wells Beach site plan amendment, appoints completeness agent and schedules High Pine site walk

Town of Wells Planning Board · August 6, 2024
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board received a Wells Beach Environmental site-plan amendment, designated the planning office as completeness agent, waived a sidewalk requirement for the LI site, and set a 60‑day continuance to allow DEP review; the board also continued the Point East workshop 30 days and scheduled a site walk for High Pine on Aug. 22.

The Planning Board received multiple smaller development and amendment applications on Aug. 5 and took several procedural actions.

Wells Beach Environmental: The board voted to receive a subdivision amendment and, by unanimous vote, designated the planning office as the completeness agent so staff can confirm the application is complete. Applicant representatives (Parker Deptula, civil engineer, and owner Peter Carthwaite) described plans to merge lots and add a 40x40 building, storage containers, paved parking and loading. Staff noted the site is in an LI (light industrial) zone, recommended no sidewalk at this location, and flagged regulatory needs: a DEP Tier 1 waste/landfill permit and an amendment to an existing stormwater permit. Staff asked for a description of materials to be recycled, more landscape buffer detail (a 40‑foot landscape buffer at the front of the site was noted), utility service clarifications and trip‑generation estimates. The board voted that a public hearing was not required and agreed to continue the item for 60 days to allow DEP and stormwater comments to be resolved.

Point East Condominium: For Point East, staff reported a revised plan but flagged parking dimensional and circulation concerns. Options discussed included converting the loop around the pool to one‑way with 60‑degree angled stalls or lengthening spaces; the board moved to continue the workshop for 30 days so the condominium association can consider the options.

Village at High Pine: The board received a subdivision amendment application from High Pines Village and scheduled a site walk for Thursday, Aug. 22 at 5:30 p.m. to review proposed guest parking, trail access and a proposed dog park; staff noted the project is partially constructed with phase work ongoing.

Enforcement and other items: Staff also reported a violation and stop‑work order on a Route 1 commercial site where required street‑buffer trees were cut; the board was notified that a future application will be submitted to resolve the buffer replacement.