Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Site Plan Sidewalk topic

No spam. Unsubscribe anytime.

Board schedules April 5 site visits for Starbucks and Wells Plaza; reviews updated plans

Wells Planning Board · March 18, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Planning Board set sidewalk site visits for April 5 (Starbucks 8:00 a.m., Wells Plaza 9:15 a.m.), reviewed updated Starbucks plans showing lot coverage at 64.5%, and discussed parking waivers, DOT/DEP permits and screening requirements ahead of public hearings.

WELLS, Maine — The Wells Planning Board reviewed updated site plans for a proposed Starbucks and the adjoining Wells Plaza and scheduled two sidewalk/site visits for Saturday, April 5.

Engineer Eric Dubey presented revised plans that reduced lot coverage to 64.5% (compliant with the town's 65% limit). The board discussed outstanding items including a DOT traffic permit, DEP permits, lot boundary information and screening/buffer details; staff noted parking calculations were updated after applicants provided a floor plan for food preparation and ordering area.

The board scheduled sidewalk/site visits for April 5: the Starbucks visit at 8:00 a.m. and Wells Plaza at 9:15 a.m. Members discussed potential parking waivers for the restaurant use and noted that once the applicants convey a parcel from Wells Plaza the overall parking count for Wells Plaza may decline, which will require further review and potentially a parking reduction request.

What happens next: Applicants will continue permitting with DOT/DEP and provide any additional materials requested by staff; the Planning Board will inspect the sites on April 5 and take up formal hearings and buffering/parking decisions at an upcoming public meeting.