Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Woodside ASRB forwards 445 Manzanita conceptual plan to formal design review after hearing on setbacks and tree protections

Architectural and Site Review Board, Town of Woodside · April 7, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Architectural and Site Review Board unanimously voted to send the conceptual design for 445 Manzanita Way to formal design review after staff and the project team clarified setback compliance, easements and tree-protection plans; the applicant said some adjacent neighbors had not yet been contacted.

The Architectural and Site Review Board (ASRB) of the Town of Woodside voted unanimously to forward the conceptual design for 445 Manzanita Way to formal design review. The board took the action after staff and the applicant discussed setbacks, easements, recent building permits on the site and protections for heritage trees.

Staff described the proposal as an addition and remodel to the main residence with a new vehicle gate and site improvements on a parcel the staff report lists as roughly "4.1 4.51 acres" (the transcript figure was unclear). Staff noted two existing driveways, a stream and stream corridor located to the east of the site, a six-foot waterline easement and a 10-foot public utility easement on the property, and that some previously issued building permits were not shown on the submitted topographic survey. Staff…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans