County presentation: McCann Road, Rockhound intersection work addresses flooding, adds culverts and asphalt
Summary
County engineer David Bailey summarized a multi‑phase colonias project that rebuilt 2.5 miles of McCann Road, added 35 culverts, raised the roadway about a foot, and constructed an intersection with 4–6 inches of asphalt and a pond to manage storm flows; costs were reported as $416,000 for McCann and a higher combined total for intersection work.
Get email alerts on the Roads Infrastructure topic
No spam. Unsubscribe anytime.
The county’s project manager presented a technical briefing on the McCann Road and Rockhound intersection improvements, describing hydrology, construction phases, and costs.
"This project was the McCann Rockhound Intersection project," David Bailey told the commission, saying McCann Road is a 2.5‑mile segment that addressed a longstanding flood zone. "The overall cost for the McCann Road project itself was 416,000," Bailey said. He also described the broader intersection work, including a storm-water pond, asphalt pavement and storm drains; at one point he said the combined figure "was about 1,400,000.0," and later referenced the intersection cost as roughly $950,000 when explaining how leftover funds were reallocated to Scotch Pine Road.
Bailey described engineering choices made during reconstruction: the road had an 11‑foot drop in grade that required raising the roadway 12 inches in subgrade and base course before paving; crews installed about 35 culverts and extensive swales and placed between 4 and 6 inches of asphalt at the four‑way intersection. The work used colonias funding with a county match (the county's match is 10%), and Bailey said the project came in under budget, freeing about $300,000 that allowed the county to add Scotch Pine Road to the scope.
Commissioners asked whether farm drainage concerns north of JD Produce had been addressed; Bailey said the design and additional swale depth or culverts would be used to resolve local farmer complaints and that the county would study and perform the necessary follow-up maintenance.
The commission did not take a separate vote on the presentation; commissioners thanked staff for completing the multi‑phase colonias project and requested ongoing maintenance and monitoring of culverts and swales.