Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
District hears two options to fix aging water tanks; bids due in December
Summary
Consultants presented two repair options for the district’s corroded water tanks—relining the existing tanks or replacing them with twelve 1,100-gallon plastic tanks—and said contractor bids and DEP application timing make a December decision time-sensitive.
Consultants from SiteLogic presented the board with two distinct options on how to address corrosion and discolored water linked to the district’s storage tanks.
SiteLogic described Option A as refurbishing the two existing tanks: cutting access openings, sandblasting interior and exterior surfaces, installing a 3–4-inch epoxy liner and a baffle to meet DEP chlorine contact-time requirements, and replacing taps and inlet/outlet…
Already have an account? Log in
Subscribe to keep reading
Unlock the rest of this article — and every article on Citizen Portal.
- Unlimited articles
- AI-powered breakdowns of topics, speakers, decisions, and budgets
- Instant alerts when your location has a new meeting
- Follow topics and more locations
- 1,000 AI Insights / month, plus AI Chat

