Summary

LAN presented a Building Condition Survey and a five‑year plan that uncovered approximately $85.6M of needs and offered a conservative $62–65M budget planning range; trustees discussed prioritizing critical BCS items, a single athletic field and a cafeteria addition, while public comments focused on turf, lights and affordability.

Danielle Farrell, a licensed architect and assistant vice president at LAN, opened the Building Condition Survey presentation and summarized the firm's fieldwork: "A BCS is required by the New York State Education Department every 5 years," she said, and noted LAN performs detailed written reports beyond the state's checkbox tool.

LAN's field teams walked roughly 300,000 square feet across Hillside and the Farragut complex. Hillside’s primary needs were modernization of interior finishes, selective window replacement, mechanical equipment nearing end‑of‑life (boilers ~30–35 years) and local stormwater/drainage priorities. LAN recommended targeted MEP replacements and facade preservation work. About Farragut, the firm called out a "dysfunctional" interior space plan, undersized classrooms, an overcrowded cafeteria and the need for accessibility improvements.

On athletics and site work, LAN presented options ranging from modest field improvements to a large, multi‑field Burke Estate plan (one high‑end option priced at roughly $12.6M for a grand athletic facility). LAN said their five‑year inventory "discovered 85,600,000 of capital improvement projects in today's money" but presented a narrower planning recommendation of about $62–65M and urged the board to prioritize within that scope.

Board members and LAN discussed state building aid eligibility and timing. LAN gave conservative guidance on reimbursement: typical building‑aid ratios for Hastings are near 42–43% for eligible building components but site work is capped (LAN cited approximately $5M of site‑work aid eligibility), so net local cost will vary by final scope. Trustees noted possible NYSED formula changes that could lower reimbursement in future fiscal years and asked for an aggressive but cautious approach to getting eligibility guidance from the state.

Public comment shifted to athletic fields. Dozens of residents took opposing positions: Alan Golds and others warned artificial turf carries environmental and injury risks and urged preserving natural grass and wetlands protection; coaches, student‑athletes and others said synthetic or hybrid systems would dramatically increase usable hours, reduce cancellations and create rental revenue opportunities. Several public speakers recommended hybrid or enhanced‑drainage natural grass alternatives.

Next steps: trustees directed staff and LAN to refine a streamlined proposal (trustee Alex proposed a focused package: 1 field with lights, cafeteria conversion to free classroom space, and critical BCS repairs) and to return with more detailed cost breakdowns, surface and lighting options, and NYSED preliminary‑submission guidance. LAN advised the board a preliminary submission to NYSED can help assess eligibility but warned of review backlogs and the need for a "secret determination" and environmental review steps before formal submission.

Votes and routine business: the board approved business items, placements and personnel consent agendas by voice vote during the meeting.