School Building Committee gives review group $25,000 authority and approves a slate of ATPs
Summary
The committee authorized its change-order review group to approve items up to $25,000 and approved multiple ATPs and credits (including a $20,500 gym lighting change and a $65,790 site electricity credit) by voice vote; most motions passed without recorded roll-call tallies.
Get email alerts on the Procurement And Contracts topic
No spam. Unsubscribe anytime.
Lisa (speaker 9) moved that the change-order review group be given authority to approve change orders up to $25,000 so the full school building committee would not need to meet as frequently for minor items; Becky Bollin (speaker 1) seconded and the motion carried on a voice vote after members agreed significant matters would still be escalated.
The committee then approved a series of ATPs (architect/contractor proposed changes) and budget reconciliations: ATP 66 R1 (gym floor removal and salvage, cost to SBC $0, abatement and donor covered), ATP 90 (compressed air system revision, +$10,313 after design refinement), ATP 103 (gym lighting control modifications, +$20,500), ATP 105 (phase 2 gas credit, savings $3,714), ATP 106 (phase 2 site electricity/security repricing, savings $65,790), ATP 107 (full court lot upgrade, $296,969), ATP 108 (West parking lot upgrade), ATP 110 (prefabricated piping for revised design, +$3,220 reported) and AQP 111 (contingency reconciliation that reallocates owner allowances to a temporary fuel allowance at no net cost). Motions for each item were moved, seconded and approved by voice vote.
Design staff and contractors explained key items in the discussion. Ted (SLAM) said the compressed-air work was refined with the construction-technology staff to reduce the earlier estimated cost from roughly $16,000 to about $10,000: "we were able to reduce the price down to, $10,000," he said. For the gym-floor salvage, the committee noted that Sarah's Foundation donated funds to cover abatement so the SBC had no net cost.
Most approvals were taken by voice vote; the transcript records committee members saying "aye" and the chair calling the measures passed. Committee members debated the review-group threshold (some argued significant items under the threshold should still be elevated) but reached agreement that the review group would continue to refer items of concern.