Summary

Public Works presented completed and ongoing drainage projects — including a 14-acre Lozano detention pond (~70% complete), multiple ditch widenings and pilot-channel cleanups — and reported distributing 34,473 sandbags during two recent storm responses; staff proposed a $235,000 back-con trailer as a lower-cost maintenance option.

Public Works staff updated the Harlingen City Commission on drainage projects completed and underway and described the city’s storm readiness heading into hurricane season.

A presenter for Public Works described the Hail Ditch project (about 3,310 linear feet widened from roughly 35 feet to as much as 70–90 feet at the top of bank), the 14-acre Lozano detention pond (approximately 70% complete) and a 2,400-linear-foot T Drain Ditch. "This is a big detention pond," the presenter said, noting first-phase completion was delayed by recent rain but expected within weeks.

Street Superintendent Danny Diaz described a localized ditch widened from 10 to 25 feet and an inlet redesign that prevents routine clogging. Assistant Public Works Director Ruth Trevino reported the city has 4,961 storm-drain inlets across five districts and said crews distributed a total of 34,473 sandbags across two recent storms (14,865 and 19,608 respectively). Trevino added the city is meeting with Cameron County to explore reimbursement for sandbag operations.

Staff also proposed procurement options to improve inlet cleaning and vacuuming: a backcon trailer priced at about $235,000 that crews could tow with a pickup versus a full vacuum truck that staff estimated would cost more than $550,000. Staff recommended considering the lower-cost trailer for downtown work first and expanding as needed.

Commissioners thanked Public Works for the work and asked staff to continue proactive inspection and coordination with TxDOT on shared drains.