Summary

The Lake County Public Works & Transportation Committee on Feb. 4 approved three procurement resolutions: a $94,965 generator replacement contract for a Remington lift station, a $165,204 contract for utility locating services (with $218,800 appropriated), and a $1.77 million phase‑1 engineering study for Rollins & Wilson.

The Lake County Public Works & Transportation Committee approved three procurement resolutions during its Feb. 4 meeting.

Director Austin McFarland recommended awarding a $94,965 contract to Buckeye Power Sales Co., Inc. for replacement and installation of a natural-gas generator at the Remington LRSD lift station, saying, "This generator at this site has reached its useful life." Member Hunter moved the contract; Member Hewitt seconded and the motion carried, with the chair noting the roll call produced the usual "Aye" responses and no recorded roll-call tally in the transcript.

Shane Schneider, county DOT director and county engineer, presented a contract with USIC Locating Services LLC for joint utility-locating work and ticket screening to process excavator 811 ("Julie") calls. "Last year we got around 17,000 tickets," Schneider said, explaining the county pays a $1.25 handling fee per ticket (about $20,600) and that the contract and associated appropriations are intended to keep locates efficient. Member Hewitt moved the contract; Member Kasben seconded and the motion carried.

Schneider also described a phase‑1 engineering agreement with Stanley Consultants Inc. to study intersection improvements at Rollins Road and Wilson Road, with a maximum phase‑1 cost of $1,773,869 and $2,130,000 appropriated from the quarter-percent sales tax for transportation. The study will evaluate signal upgrades, turn lanes, roundabout alternatives, drainage and bike-path connections and is expected to take 18–24 months. Member Hunter moved the Stanley agreement; the motion was seconded by Member Casben and carried.

Transcript notes: motions on the consent agenda and each resolution were recorded as "motion carries"; the transcript does not include a numeric roll-call tally for the votes. Several members asked technical questions during presentations (equipment lifespan, salvage of old generator parts, and bidder price differences) and staff answered on the record.

Next steps: procurement and contract execution will follow standard county purchasing procedures; the phase‑1 engineering study will include public outreach if the study identifies viable improvement alternatives.