Lowell planning board approves five-unit development at 558 Gorham Street
Summary
The board approved a special permit and site plan for NLK Homes to build a triplex and a duplex (five units) at 558 Gorham Street, 4–1 on both votes, with conditions on trash pickup, snow removal, HOA enforcement of fire access and follow-up with utility comments.
Get email alerts on the Land Use topic
No spam. Unsubscribe anytime.
The Lowell Planning Board voted 4–1 on March 2 to grant a special permit and site-plan approval for a five-unit residential project at 558 Gorham Street, allowing one triplex and one duplex in the Urban Mixed-Use (UMU) zone.
The applicant, appearing on behalf of NLK Homes, told the board the current submission re-labels the two duplex garages as single-car garages for permitting while leaving the physical garage openings unchanged and adds a surface parking space to meet the 10-space requirement for the lot. The representative said the design also shifts a small landscape wall and adds a sidewalk to provide shoveled access to the middle triplex unit.
"We're not gonna rely on the two garage parking spaces to meet our requirements," the applicant's representative said, describing the additional surface parking and a 13-foot area in front of units intended to improve maneuvering and create informal driveway space.
Board members focused on circulation, emergency access and dimensional compliance. A board member summarized zone requirements cited in the meeting: the minimum lot area per dwelling unit, setback and parking rules in the UMU zone, and concluded the proposal meets the numeric zoning standards while acknowledging layout concerns remain about turning radius and the effective space between buildings.
One board member made a motion to approve the special permit with conditions requiring private trash pickup, proactive snow removal so parking spots are not lost in extreme weather, HOA bylaws that prohibit blocking fire access, and continued coordination with wastewater and water-department comments. The motion passed 4–1; the board then approved the site plan with the same conditions by the same margin.
The approvals are conditioned on follow-up with city departments on utility comments and on homeowner-association language to ensure unblocked fire lanes. Board members said the record should note the architectural plans submitted on January 11 remain the basis for final architectural details and that the site plan stamp reflected a February 22 date.
The applicant was thanked by the board and said he would return if further issues require board attention.
Next steps: The approvals allow the applicant to proceed to required permitting and to work with city departments on the noted conditions.