Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Permitting Fees topic

No spam. Unsubscribe anytime.

Interlaken considers code revisions and higher fees for water connections and permits

Interlaken Town Council · March 3, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Council discussed splitting demolition and site-disturbance permits from building permits, creating a flat-work permit for driveways, and reexamining the water-connection fee (currently $2,300) after staff presented higher material and installation cost estimates.

Town staff outlined proposed town-code and permit-fee changes March 3, recommending the council split certain permits and reassess fees to reflect actual costs.

Staff (S1) said the current new-building permit covers demolitions, site disturbance and flat work; he proposed separate permits for demolition, site disturbance (landscaping/excavation) and flat work (nonstructural concrete/asphalt such as driveways) to allow distinct criteria, inspections and deposits.

On water connections, staff noted the town currently charges $2,300 for a new water connection but that a materials-and-labor analysis shows the actual cost can be substantially higher depending on conditions (e.g., whether the lateral is under asphalt, requiring a hot tap and trenching). "We're already looking at twice..." staff said when comparing ideal and worst-case installation scenarios, and recommended a base charge plus additional fees tied to installation complexity rather than a fixed, underpriced fee.

Council members discussed enforcement codes and the possibility of adopting a broader fee schedule like those used in surrounding municipalities, while avoiding making water-service installation a town 'profit center.' Staff said the town would continue to refine the fee schedule during upcoming budget discussions.

No code or fee changes were adopted at the meeting; staff will return with draft ordinance language and updated fee tables for future council review.