Summary

Road & Bridge superintendent presented a 'state of the union': the county maintains roughly 767.604 miles of roads with 32 dedicated FTEs, reported recent and planned asphalt investments, and recommended updating standards and reinstating petition-based road hearings (advertise in July; requests due Aug. 1; hearings in September).

Grand County Road & Bridge Superintendent David Buckley briefed the Board of County Commissioners in a workshop on staffing, capital investments, road miles and a staff recommendation to reinstitute petition-based road-maintenance hearings.

Buckley told commissioners the county is responsible for about 767.604 maintained miles and roughly 38.845 non‑maintained miles. He described a multi-year effort to repair and preserve asphalt routes (a decade-long program that has spent roughly $15 million between 2014 and 2023, with additional projects in 2024–25), current staffing of 32 full‑time employees dedicated to maintained roads, ongoing recruitment and a suite of retention measures (new pay scale, sign-on bonuses and improved time‑off accrual). Buckley said the department is implementing operator‑proficiency reviews starting in 2026 to measure equipment performance and safety.

On process, Buckley reviewed the county’s Road & Bridge Standards Manual and the 2014 resolution that suspended road hearings during a period of constrained revenue while the county completed a backlog of asphalt work. Staff recommended updating the Road & Bridge Standards (to clarify right‑of‑way, driveway/culvert responsibilities and ADT thresholds) and then accepting petitions for maintenance. Staff proposed the following timeline if the board concurs: adopt updated standards by May, advertise for petitions in July, accept requests by Aug. 1, inspect through late summer, and hold hearings in September (the historic model used before 2015).

Commissioners and staff discussed alternatives (individual petition processing vs. annual hearings), cost and enforcement responsibilities for culverts and driveway connections, and the need to revise standards before accepting new roads for maintenance. Several members asked for a pragmatic standards update in time to permit a September hearing cycle; staff estimated the standards update could be completed in months with focused work by the county engineer and Road & Bridge leadership.

Direction from the board: commissioners supported updating the manual and asked staff to proceed with a schedule that would allow a July advertisement and an early-September hearing cycle contingent on completing standards revisions and inspections.

Next step: staff will confer with the county engineer to finalize updated Road & Bridge Standards and return with schedule details; the board directed staff to prepare the August petition intake and a September hearing date if standards were complete.