Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Transportation topic

No spam. Unsubscribe anytime.

Engineers and county discuss Heart River Bridge deck width, detours and cost estimates

Grant County Commissioners · March 19, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Sauber Engineering presented Project BRC-1927(065) PCN 23981 (Heart River Bridge); the board discussed changes to deck width, alternate detour routes, construction plans and differences in estimated costs and requested further input.

Sauber Engineering requested input from the Grant County Commissioners on Project No. BRC-1927(065), PCN 23981 (Heart River Bridge). John Sauber outlined proposed changes to the bridge-deck width and asked for feedback on potential detour routes and construction plans; the minutes record a discussion that also touched on differences between estimated costs for alternate designs.

County officials and Sauber discussed the trade-offs between deck-width options, the availability of alternate detour routes during construction, and how those choices affect overall cost estimates. The board did not take a formal vote but provided input and asked for additional detail to inform later decisions or approvals. No final design or schedule was recorded in the minutes; Sauber requested further guidance from the commission before advancing final plans.

The minutes list the project identifiers but do not include estimated cost figures or a construction timeline; those items will need to be provided in subsequent staff or consultant reports for board consideration.