Resident seeks lot consolidation after permit issued across two parcels; Board explains SALDO process
Summary
Resident Tim Faust asked the Board for guidance after a fence permit was issued across two parcels on one deed; Solicitor Backenstoe advised a minor subdivision under the Lehigh Township SALDO is the typical solution and warned that granting waivers could set precedent.
Get email alerts on the Land Consolidation topic
No spam. Unsubscribe anytime.
During public comment, resident Tim Faust described a permit error where a fence spanned two distinct tracts that currently sit on the same deed. Faust said he purchased what he believed to be one parcel and now wants to consolidate the two tracts so an accessory building for horses can be built on the lot with his home.
Township Solicitor David Backenstoe told Faust that under the Lehigh Township Subdivision and Land Development Ordinance (SALDO) consolidating the two parcels would generally require a minor subdivision application to Planning, although waivers are sometimes used by other townships. Backenstoe cautioned that Lehigh Township has not typically granted such waivers and that doing so could set a precedent.
Board members and residents debated the timeline and potential cost—residents noted fees for land development plans can be substantial—and whether the Board could approve a simple deed change as some had done in past situations. Supervisor Cindy Miller and others emphasized the role of planners in reviewing subdivisions and said the process is the standard route. Backenstoe added that with a good engineer the matter could likely be resolved in a single Planning meeting followed by Board approval.
Faust said he hoped to have a structure in place before winter; the solicitor and Board advised him on options (minor subdivision or waiver petition) and the likely procedural steps and costs.
The Board did not take action on the permit itself at this meeting; the matter was described as subject to Planning review and any waiver request would require formal consideration.