The board approved an $89,577 final payment on a bridge replacement, accepted a small change order reduction, contracted a hydraulics and hydrology study for a weight-limited bridge and entered a Joint Powers Agreement with South Dakota DOT for a federally funded safety project that will add rumble strips and recessed pavement markings.
Get email alerts on the County Highway Projects topic
No spam. Unsubscribe anytime.
Union County commissioners on Oct. 1 approved multiple highway actions, including a final payment, a contract for an engineering study and a state agreement to secure federal safety funding.
By motion of Joffer, seconded by Dailey, the board approved a final payment of $89,577 for BRO 8064(00)23-1, Structure No. 64-030-034; the project was described in the minutes as a large replacement project. A separate motion by Dailey, seconded by Kimmel approved Change Order No. 1 for the same structure that reduced the contract price by $1,384.96 from the original contract of $90,981.96; the motion carried.
The board also approved a contract with Ulteig Operations LLC to perform a hydraulics and hydrology study for Structure 64-120-062. Highway Superintendent Jerry Buum said the bridge is currently open to one-lane traffic with a 6-ton weight limit and that Buum’s plan is to replace it with 72-inch concrete culverts arriving in the coming weeks. The motion to contract Ulteig was moved by Joffer, seconded by Dailey and carried.
Commissioners approved a State of South Dakota Joint Powers Financial & Maintenance Agreement with the Department of Transportation for a project eligible for 100% federal funding under the Highway Safety Improvement Program. Buum requested that stop signs on county asphalt roads receive advanced-warning rumble strips and recessed pavement markings as part of the work. The motion to approve the joint-powers agreement was by Dailey, seconded by Kimmel and carried.
The minutes record motions and outcomes but do not include a roll-call vote tally or a detailed project timeline beyond the note that culverts are expected in the next couple of weeks.