Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Owner of Gathering Barn seeks event-venue approval; county requires engineer sign‑offs, parking, septic and fire plans

Benton County ERC (technical review) · November 12, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Stephanie Moss asked the county to allow her existing 60x40 barn to operate as a small event venue (about 100 people). County staff said the building needs structural-engineer sign-off, stamped MEP/architectural plans, fire and life‑safety plans, an accessible parking plan, and ADH/septic confirmation; 9‑1‑1 assigned a new address (11397 Mill Dam Road) for emergency dispatch.

Stephanie Moss presented an already‑built 60-by-40 barn located near Mill Dam Road and asked the county for review and approval to operate it as a small event venue. Moss said the barn seats roughly 100 people in its assembly area and already contains two restrooms and a small kitchenette intended for caterers.

Staff from building safety said the structure as-built requires an engineer’s signoff and stamped MEP and architectural plans because construction and…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans