Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Stormwater Budget topic

No spam. Unsubscribe anytime.

North Logan moves ahead with stormwater master plan study in FY2027 draft budget

North Logan City Council · March 4, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Stormwater Department’s FY2027 draft budget funds a Sunrise Engineering stormwater master plan study to model flows and inform future impact fees, and prioritizes minor infrastructure maintenance such as fixing sinking curbs and installing leaf grates.

On March 4 the council heard the Stormwater Department’s FY2027 draft budget. Ryan VanWeerd told the council the stormwater fund is an enterprise fund and described major budget elements, including a Stormwater Master Plan engineering study with Sunrise Engineering to provide detailed modeling of stormwater flows and future infrastructure needs and to support creation of stormwater impact fees for future development.

VanWeerd said maintenance funding will focus on smaller system repairs such as fixing sinking curbs, improving drainage box grades and installing leaf grates. The council received the draft; no appropriation was adopted at this meeting.